US Filter to build MF plant in California

US FILTER HAS BEEN AWARDED A CONTRACT to provide a microfiltration plant for the Orange County Water District (OCWD) and the Orange County Sanitation District (OCSD) in Fountain Valley, California.

The $25 million continuous microfiltration submerged (CMF-S) system will be a crucial part of an advanced water reclamation project. The CMF-S system will draw secondary wastewater from the nearby sanitation district, treat it, and then inject it into deep groundwater aquifers to prevent seawater intrusion.

The 328Ml/d plant is due to be commissioned in 2004. The OCWD currently purchases ...

Subscription required

To read this full article you must be subscribed to Global Water Intelligence.
Subscribe Now, Sign up for a Free Trial or Log In