Jebel Ali M station scaled back

DEWA cuts power and water to 264, 80m<sup>3</sup>/d and 1,200MW on reissue.

Dubai Electricity and Water Authority has reduced the scope of its M station from 477,339m3/d and 2,000MW to 264,980m3/d and 1,200MW. The tender was reissued in September after the initial process attracted two incomparable bids, with only the Doosan bid covering both water and power elements. It is hoped the reduced size ...

Subscription required

To read this full article you must be subscribed to Global Water Intelligence.
Subscribe Now, Sign up for a Free Trial or Log In